For designers and installers

The change is at the tank. Nothing after it moves.

Fuji Clean carries RIDEM Category 1 Technology approval, which is the part that matters to your drawing: as a Category 1 system, the design work downstream is identical to what you are already producing.

Category 1RIDEM-approved technology, so the design work downstream is identical
UnchangedDrain field sizing, loading rates, pump basin and float arrangement
PDF + CADStructural drawings published for every residential and commercial model

What stays exactly the same

  • Drain field sizing
  • Loading rates
  • Configuration of every component following the tank
  • Pump basin size
  • Float arrangement

What actually changes

  • One vessel in the excavation instead of a treatment train
  • No preceding septic tank
  • One ¾″ airline from a blower that can sit up to 100 ft away
  • Three at-grade covers, 20″ and 24″ diameter, as the only visible work

Everything downstream, held still

The same section, both ways.

Toggle the arrangement and change the model. The pump basin, the floats and the drain field are drawn once and never move.

Cross-section with a conventional multi-tank treatment train feeding a pump basin and drain field.Septic tankTreatment unittypical two-vessel arrangement, schematicground you no longer open8′0″ × 4′1″FujiMAC 80RIIPump basin, floats and drain field: unchangedsized and loaded exactly as you design it now
Tanks in the excavation
Two or more
Preceding septic tank
Required
Footprint
Sum of the vessels
Dry weight
Concrete, set by crane
Power draw
Varies by unit
Certification
Varies by unit
Drain field sizing and loading rates
Unchanged
Pump basin size and float arrangement
Unchanged

Somebody stays responsible for it afterwards.

Fuji Clean USA and Integrated Septic Solutions train and certify the operation and maintenance people who service Rhode Island systems, and manage maintenance across them. A certified installer and maintenance provider database is available for review at any time.

4″ in, 4″ outPlus one ¾″ airline. Those are the only connections at the tank.
One panelA simplex panel takes the blower and the drain field pump. No time dosing.
Mini excavatorSets a CEN5 through CEN10. There is only one tank to place.

Drawings, CAD files and approvals.

Fuji Clean was approved as a Class 2, Category 2 technology on 27 November 2019, and as Category 1 on 11 March 2021. The approval package below carries the statement and the Q&A written for Rhode Island septic system professionals.

<20 mg/L

BOD and TSS, the Category 1 standard. Field data runs 9 to 10.

<19 mg/L

Total nitrogen. Maryland field data returned 11.0 across twelve sites.

The approval package (PDF)Structural drawings and CAD